Septic Systems
People applying for Septic
System Permits are required to complete a Building Permit Application which may be printed from the Forms section of the website or picked up at the
Administration Centre on the lower level of the building. Please note that you will require the front page of the regular
Building Permit Application to be filled out in full and the Septic Information
Permit also. A qualified person is required to design the system
unless the exceptions noted on the Ministry of Municipal Affairs and Housing website are met. A
"T" time of the soil (a time determined for the type of soil your
septic bed will rest upon) will be required at the time of submission, with a
sketch showing the layout and cross section of the design of the septic
system. A test hole should be provided prior to submission of the
application to allow the inspectors to see the native material and the ground
water level.
The folloiwng items are reqruired when applying for a septic permit:
- Building Permit Application
- Schedule 1 Designer Information
- Schedule 2 Installer Information
- Septic Information Form
- A "T-Time" Report (a time determined for the type of soil the septic bed will rest upon)
- Site Plan (noting the location of septic tank, septic, structures, property lines, well(s) and type, neighbouring wells and types, water ways, ponds and lakes)
- Layout of the septic system
- Cross Section and Elevation of the septic from the existing grade
- Test Hole should be dug to verify the location of water table and bedrock
Related Links
Building Permits
Building Permit Inspections
Contact Building Department
Your Septic System: Protecting Your Investment and the Environment