Notice of Road Ditch Maintenance - Marshall Crescent

Upcoming maintenance work is scheduled to take place on the Marshall Crescent roadside ditches.

The work will involve the removal of accumulated sediment from the road ditches, restoring them to their original grade line.  In addition, built-up material on the road shoulder will be removed to ensure proper drainage from the road surface into the ditch.  All disturbed areas will be hydroseeded upon completion of the maintenance work.

Work is scheduled to start on Monday, May 12, 2025, weather permitting, and is anticipated to take four to six weeks to complete. Access for Emergency Services, Student Transportation Services, Waste Collection, and Postal Services will be maintained at all times.  We thank you in advance for your patience and cooperation during this maintenance work.

Should you have any questions, please contact Myles Douglas at 519-806-9790 or Tom Pridham at 519-939-1578. You can also contact John Kolb at 705-424 - 9914 ext. 112 or email jkolb@essatownship.on.ca

 

 

Scroll to top